Clean & empty 'Crafting Area' of Computer Room. Find new location for materials.- Sell Drafting table from Computer Room that is no longer on Kijiji
Clean 'Sewing Area' of Computer Room.Find new location for materials.- Sell sewing desk.
Clean "Guiding" drawing in computer room.Give away relevant materials to current Guiders.Empty closet in Computer Room.Find new locations for items in closet in Computer Room. Board games relocated, wrapping paper still looking for a home, Buddy's too big clothes relocated to Chuck's current room, his future room.Pitch tons of crap from Computer RoomBurn tons of crap from Computer RoomGet Hubby to hang remaining drywall in Computer room, new downstairs bath, new downstairs hall closet, 2nd closet in Computer room. Really, I'd be happy with just the drywall inside the bedroom, as it's the highest priority (at least for me) right now.Mud drywall in new bedroom.Sand drywall in new bedroom.Mud drywall again.Sand drywall again.Prime Drywall.Maybe even paint the drywall.Declare that the Computer room is no longer a computer room, and is now Master Bedroom.Move Bed into Master BedroomMove Chuckles into former master bedroom. Get new dresser, for either her or me. Probably me, then we don't need to move my current one at all.Purchase new mattress for Chuckles.Give Buddy old mattress. Move him out of toddler bed (as it is our crib as well).Make crib look unappealing to him, so that the transition to the big boy bed is easier.Move Buddy into Chuckles current BedroomRe-set up Buddy's room as nursery. Dig rocker out of basement.Make Sheets for Family Heirloom Cradle that are gender neutral. -Edited to add.... my aunt has volunteered to do this!Or for the bassinet.Or, possibly get rid of bassinet, since I don't think we'll need both.- Make Halo-Type swaddler sleepsacks for thing-three, since our house gets cold overnight.
Or, possibly break down & purchase Halo Sleepsacks. But I already have the material. And if I make the sleep sack, that will help with task #3 above.Alternatively, win a Halo sleep sack from one of the ten contests I entered last week. And hope that the contest was indeed open to Canadians, 'cause many aren't....(didn't win, too bad....) - Make Felt Lunch box for Buddy's Christmas present, since he liked Sweet Pea's, and thought it was for him. Maybe he'd like this for his birthday instead.....
Make new cloths for Bum-cleanings, since I prefer cloth to disposable. This should not be hard, I have old flannel, it needs to be cut into squares & just stitched around to prevent fraying. On second thought….Edited... mom said she'd help with this one.Improve Chuck's sewing machine skills by having her work on a few 'samplers.' She can cut them into squares, and just stitch around to prevent fraying….. hmmmm……..Dig out receivingblankets & wash. Luckily, most other equipment has been washed & pulled out, as the kids new 2nd cousin will be visiting Ontario from New Brunswick for December, so will be borrowing some items.
Saturday, November 20, 2010
Why I am thanking God for the nesting instinct right now....
Wednesday, March 31, 2010
Friday, February 5, 2010
Master Bedroom Renovations
Last week, we began work on the Master Bedroom. I fussed and fretted over what colours to do, then finally made a snap decision, bought paint, and painted, all in one night.
I had to do all my painting either during his naptime, or when Daddy could play with him. There was NO WAY he was going to play nicely downstairs while his Mommy was busy upstairs! He wanted to help out!
- Choosing &; buying new curtains
- Installing chair rail along the divide between the blue & yellow. We're going to install Pine chair rail, which will need to be stained first. I don't really want to stain it in the house, 'cause it'll stink, and I don't really want to do it out in the garage at this time of year. So it's going to have to wait until spring.
Hosted by Cecily and Robyn
Tuesday, February 2, 2010
Wow, I feel productive...
When we moved in, the house was a hodge podge of:
-white 'decorative' (square) light switches & outlets
-white regular light switches & outlets
-beige regular light switches & outlets.
And they were all... icky. like, to plug anything is was a challenge, 'cause there was gunk built up inside the outlets, and you couldn't really get a plug in very well.
And some of them were painted over, some had paint to the edges.....
And, sometimes they had a white switch with a beige plate... or vice versa
As we've been painting, we've swapped them for plain white switches & outlets. Since we'd already done the kids rooms & bathroom, upstairs, our room was the only one left. so I switched all the outlets Saturday night, and then Sunday after church, switched the light switches.
Then realized, that I already had the breaker off for the two light switches in the hallway, so I did them.
Then realized, I already had the breaker off for the switch at the bottom of the stairs, so I did it.
Then, since I had the tools out, did the one in the living room.
Then, since there was the three in the hallway right nest door, did them.
THEN, since there was only the kitchen & the outside light left to do in the dining / living / kitchen (all connected), I did them.
THEN realized, that If I did the hallway to the computer room, the computer room, and the little bathroom, the whole downstairs would be done.
so, for outlets, I have left:
- four in the computer room
- one in the hallway to the computer room
- one GFI in the bathroom
- Two regular in the kitchen
- Two split circuits in the kitchen
- one in the front entrance.
For light switches, there are two in a utility area, which I wasn't going to worry about, but I have two switches left over, so I'll probably do them, just cause I already have the stuff.
Wednesday, January 27, 2010
Painting
This shade yellow & This shade blue... or maybe this yellow.... or do you think that this yellow makes the curtains look washed out??? Or should we go with the yellow, and change the curtains?
One blue wall, three yellow walls?? Two & two? how 'bout top half yellow, bottom half blue.... OR, top half blue, bottom half yellow?
When I left work yesterday, I still had no final decision. BUT, I had primed the room on the weekend, our bed was out, we're camping in the (unheated) basement with a baby monitor upstairs to hear the kids. I got home, tossed out all the paint chips I didn't like, choose two, didn't think about it, didn't look back.
Stopped to make supper.
Drove the carpool to Pathfinders with Hubby.
Got him to drop me off at Home Hardware on the way, drive the girls, and come back for me.
When he came back, I had two gallon cans of paint.
Got home around 7:30, drew my line about three feet up, and started painting the top half yellow.
I started with the top for two reasons:
- Yellow is lighter than blue, so if I paint too far down, the blue will cover it up
- Hubby will be doing the ceiling, but not until after I paint. if I do the top, then he can do the ceiling at any time.
Finished the yellow around 10:00 at night. looked at the already taped off, only three feet high, lower half that was going to be blue. It is probably about 1/3 of the space of the yellow.
Got a clean brush & tray.
finished the bottom at 11:30. cleaned up, and fell into bed at 11:45.
I must say, for someone who at 3:30 yesterday had no idea what they were going to do... I got a Heck of a lot done!!
It looks very "Caribbean" we think... I'll post pics in a few days.
Saturday, January 23, 2010
Progress...
By this afternoon, we had three walls and part of the ceiling painted. I guess I'd better make a decision really soon about what colour we're gonna go with....
Sunday, November 29, 2009
New Wood Shed
We've been talking about this for a few weeks now. We even had the deck blocks in place, the floor decking bought, and the support joists already framed up.
BUT, before we could begin, we had to level the deck blocks, something that neither of us was looking forward to. Last Sunday, we were listening to the weather, and realized that it will probably snow towards the end of the week, and we really, REALLY need to get our wood for the winter off the ground.
We've previously stored it under the deck, on skids, but it was getting very very wet under there, so we needed another option.
Since Sunday was a beautiful day, that afternoon we started digging to level the blocks off. The blocks got levelled, and the support beams placed. The joists were already built into a frame. We placed the floor joists on the support beams, and attached them together. Well, WE stated attaching them together, then I hammered my thumb REALLY HARD, and retired for the day. Hubby finished attaching them, and put the floor decking in place.
Then Tuesday night, Hubby built the frames for the first three walls, and I held them up while he attached them to the frame and together.
Hopefully in the next couple of days, we can build the front wall, and figure something out for the roof, whether its a proper 'lean-to' type roof, or just a tarp for this winter. Until we have at least part of a fourth wall, we can't start filling it with the wood, because while the two back corners are very sturdy, the front two corners are still a little wobbly, they need the structure of the last wall.
Right now, we think it looks like we're building a life-sized nativity scene!
Saturday, November 28, 2009
Monday, October 26, 2009
Deck & Daddy's helper
Wednesday, September 30, 2009
The benefits of coming home early......
Thursday, March 20, 2008
New Furniture
It is solid wood, made by members of a Mennonite community.
To fit it in the van, we had to take out the seats on the right hand side. Driving home, the front passenger seat was pulled up as far forward as it could go, Hubby drove, I sat in the chair behind hubby, and Little Raven sat in the chair behind me. It made me very, very glad that I had insisted that the new van had to have 50/50 or 60/40 seats in the rear, as we would have had to take two vehicles otherwise, and it is a two hour drive!!
In renovation news, we have restored power to the upstairs bathroom, hallway, and our room. Little Raven still has to use a flashlight in the mornings though. At least it is still light out until later in the evenings now!
Tuesday, March 18, 2008
We have walls!
Not only do we have walls, but we also have a WORKING TAP in the bathroom... no more running a hose from the basement up two flights of stairs to fill the tub.
It's a little primitive still, but at least I can adjust the temperature of the water while in the tub now:
We have not painted the room blue, that is just the colour of the bathroom drywall. Tonight I can start the mudding if I'm feeling up to it. I was home yesterday with Little Raven who was sick, and I can feel the start of a bit of a tickle in the back of my throat today... ugh.
Tuesday, March 11, 2008
More Progress
Still no proper supply line though, as the taps can't be installed until the tile backsplash is installed, and we haven't even LOOKED at tiles yet, yet alone picked out a pattern or purchased any.
It makes filling the tub an interesting challenge. Hubby had a meeting last night, but said we could go ahead and use it, just hook up the garden hose to the laundry room taps to fill it. Ok fine. So I hooked the hose up to the cold water in the old laundry room, sent Little Raven upstairs to make sure that the water was going in the tub, and filled the tub slightly. Then switched the hose to the hot tap. Turned it on, annnnnd... nothing. huh. Oh wait, the shut off valve is still off. Then looked more carefully. The shut off valve on the cold tap was ABOVE the tap. On the hot tap it was BELOW the tap. So if I turn that valve on, water is going to go straight up those pipes to... the open end behind the brand new drywall. Right. Ok, I think I will wait until hubby gets home.
Hubby comes in, says no, I meant the NEW laundry room tap.... ohhhhhh.......
So we hook up the hose to the new tap, run it across the basement up through the hole in the floor to the old laundry room, up through the hole in the floor into the bathroom. Now one person has to stand downstairs (there's only one tap in the new laundry room, seeing as it has a proper faucet, unlike the old) and work the temperature knobs, while the other person stands upstairs and yells "More Hot!!" "Add some Cold!" down to them.
Ah the joys of a home renovation. I just think it's a good thing that we are all campers. I mean really, if we can rough it in the bush for a week, with the nearest civilization at least a days paddle out, we can definitely live like this in our own home!
Monday, March 10, 2008
Progress
Friday, March 7, 2008
And the Construction Continues….
Possibly a reason why we have needed to do the amount of renovation that we have
One wall missing
Bathroom window (left), and Baby’s window (right)
The only working bathtub or shower in our house
You can see the two doors, on the left, the Baby’s door, and on the right, the bathroom door.
Wednesday, March 5, 2008
I Think I Have A Headache....
By the time we went to bed that night, one of the bathroom walls upstairs was also gone!! the wall that backs onto the Baby's room that was taken down. The wall beside the toilet that backs onto the Baby's room. Did I meant ion that at the moment, there is not a door to the baby's room yet??
Baby's room. That is the back of the bathtub that you can see to the left of the photo. Where the black pipe is, is where the wall is open to the bathroom, and the toilet is just to the right of that.
Hubby removing the old floor. I think that the MOL would have a problem with his choice of footwear.... lol
Laundry room walls, with more useless pipes.
Tuesday, March 4, 2008
Kid Room #1 - DONE
After this coat of primer, we added a coat of black primer (no, she isn't in the black paint with purple polka dots stage. Yet), which is full of iron filings. This primer is really cool (also, really expensive), and makes the wall magnetic.
After that, we finished painting the blue:
And then hubby started installing the border and the wallpaper. We hang wallpaper and border backwards from the instructions, border first, then wallpaper. It works for us. This was the final result, before furniture:
And then on Sunday morning before church, we moved her in:
(you can see the papers attached to the wall by magnets in the picture above)
We still have to put trim up, and a closet door, and we are planning on hanging a fish net on the ceiling for her stuffed animals. Baseboards will eventually go up also, but we are planning on ripping out the carpets in the next couple of years, so not until the floors are redone. There are no baseboards in our house anywhere, and wasn't when we moved in, so why make this room any different?
According to hubby, this is the nicest looking boys room he's ever decorated. It is definitely a far cry from the pink fairies and butterflies that were in her last room. My child is definitely not a girly girl.
Tomorrow's post.... the progress that has not been made on kid room #2!!
Monday, February 25, 2008
Kid's Rooms
And the after shots:
Right now LR's bed is on the side that will be the baby's, but we are working on her side right now so that she can be moved in soon, and it is easier to do that with that half empty!
Wednesday, September 26, 2007
Fireplace
This fireplace is very cool, the top of it is an actual cook surface (not that I would try to pull off a gourmet meal or anything....), and it has a fan on it to push the hot air out. The cook top would be cool for hot chocolate or apple cider.